Model Estimate for Small Water Harvesting Ponds

Model Estimate for Small Water Harvesting Ponds

Item-1
Earth work in excavation of local soil within 15 m Lead and 1.5 m Lift Volume of Earth 7+6/2 *4+3/2 = 6.5*3.5

22.75*1
= 22.75m2
= 22.75m2
          
Item-2
Stone work for Bank Volume of Work Length = 22m = 22*1*0.33 = 7.26m3
Cost
1. Earth work @ Rs. 5.25 m3 = 22.75*25.00 Rs. 568.75
2. Stone work @ Rs. 31.50 m3 = 7.26*116.00 Rs. 842.16
3. Cost of provision to carry the excess water to drainage line = 4 man days Rs. 160.00
4. Cost of plastering by cement cow dung L.S. Rs. 300.00
Say Rs. 1,927 per no Total Rs.  1870.91
Rs.     56.17
Rs. 1927.03